VALUATION AND RISKP/Ewith a discountDVMD0(1+g)MMHborrow, convert, depositIRPforward rates
3ways to value an unquoted company
⅓–½discount on a quoted P/E
4steps in a money market hedge
2marks per question, no partial credit
ValuationExample: valuationRisk managementExample: hedgingCase drillFAQs

Areas F and G of ACCA FM are mostly examined in Sections A and B, where each question is 2 marks with no partial credit. That makes method the whole game: the right side of the exchange rate quote, the discount on a proxy P/E, D1 and not D0. This guide follows Hamzah’s revision notes for both areas, with two worked examples and a Section B case.

FM guide series:How to pass FMWorking capitalInvestment appraisalFinance and cost of capitalValuation and riskFM formulas

Business valuations

The story
Sable Co is for sale. What is one share worth?
Sable Co is not listed, so there is no share price to look up. The owners want the highest price. The buyer wants the lowest. Each side reaches for the method that suits it. The exam asks you to build the range of values and explain it.
The seller says“Our earnings and dividends will keep growing. Pay for the future.”
The buyer says“I only pay for what I can see today.”
Try it: three methods, three prices
Sable Co: 5 million shares, EPS $0.50, net assets $16m, quoted competitors on a P/E of 12, return on reinvested funds 15%, risk-free rate 4%, equity risk premium 7%. Change an assumption and watch the price move.
Discount on the quoted P/E
Net assetsThe floor
Earnings (P/E)A controlling buyer
Dividends (DVM)A minority holder
Which method would you reach for?
In Section A the question is often this choice, not the calculation.
Tap a situation to see which method fits and why.
Net assets(Assets at realisable value − liabilities) ÷ shares. It is the floor value, used for asset-stripping, security for loans and liquidation. It ignores intangibles and earning power.
Net assetsThe lender cares about what the assets would fetch, so the asset basis is the relevant one.
Dividend valuation modelA minority shareholder only receives dividends. P0 = D0(1 + g) ÷ (Ke − g). Remember: D1, not D0.
P/E basis, or discounted cash flowA majority buyer controls the whole earnings stream. Use EPS × a proxy P/E, discounted by ⅓–½ because unquoted shares are hard to sell. DCF is the most theoretically sound, but needs forecasts.
Market capitalisation plus a bid premiumShares × price is the benchmark for a listed company. A buyer must add a premium to gain control.
Not the dividend modelDVM fails if there is no dividend, or if g ≥ Ke. Use an earnings or cash flow basis.
Examiner trapP/E of a quoted proxy applied to an unquoted target without a discount is the classic lost mark. DVM uses D1 = D0(1+g), not D0.
The rules, for revision
Open a topic when you want the full list.
Valuation methods
Net assets(Assets at realisable/replacement value − liabilities) ÷ shares. Floor value; ignores intangibles and earning power. Use: asset-stripping, security for loans, liquidation.
P/E (earnings)Value = EPS × suitable P/E (proxy, sector). Discount the proxy P/E by ⅓–½ for an unquoted company (marketability). Adjust earnings for one-offs.
Earnings yieldValue = Earnings ÷ EY (EY = 1 ÷ P/E). With growth: E(1+g) ÷ (EY − g).
Dividend valuationP0 = D0(1 + g) ÷ (Ke − g). For a minority holding. Ke from the buyer's / market required return. Fails if no dividend or g ≥ Ke.
DCF / free cash flowPV of future cash flows at WACC (entity) or Ke (equity). Most theoretically sound; needs forecasts and terminal value.
Market capitalisationShares × price — the benchmark for listed companies; add a bid premium for control.
Debt & other securities
Irredeemable bondi ÷ Kd (investor's pre-tax required return)
Redeemable bondPV of interest + redemption at investor's required return — price falls when market rates rise
Preference sharesDividend ÷ Kp
ConvertibleHigher of (PV as straight bond) and (PV of conversion value); market price sits above the floor
Why you value & why answers differ
ReasonsTakeover/merger, IPO or sale of unquoted shares, tax, loan security, divorce/probate, management buyout.
Range of valuesAsset basis = minimum seller accepts; DCF/P&E = maximum buyer pays; actual price negotiated between. State which is more relevant to the party in the question.
Adjustments a buyer makesSynergies, redundancy costs, one-off items, different risk (Ke), control premium.
Market efficiency & share prices

Under semi-strong EMH the quoted price is the best estimate of value — a bid at a premium implies expected synergies.

Practical influences on price: interest rates, market sentiment, sector news, dividend announcements, liquidity of the stock, speculation.

Fundamental analysis (intrinsic value from future cash flows) vs technical/chartist (past patterns) vs random walk (prices move randomly around fair value).

Typical Section B question set

Q1 net assets, Q2 P/E with discount, Q3 DVM with g = rb, Q4 bond price at a new yield, Q5 a statement question on EMH / reasons for the valuation range.

Worked example: valuing an unquoted company three ways

The dividend model with g = rb, the P/E method with a marketability discount, the asset basis, and then the range.

Sable Co (unquoted)

Question

5 million shares. Earnings $2.5m (EPS $0.50), dividend $1.5m (DPS $0.30) — payout 60%, so retention 40%. Return on reinvested funds 15%.

Net assets at realisable value $16m. Quoted competitors trade on a P/E of 12.

Risk-free rate 4%, equity risk premium 7%, appropriate equity beta 1.1.

Required: value one share on (i) dividend, (ii) P/E and (iii) net-asset bases, and explain the range. (10 marks)

Answer

(i) Dividend valuation model

g = r × b = 15% × 40% = 6%. Ke (CAPM) = 4% + 1.1 × 7% = 11.7%.

P0 = D0(1 + g) ÷ (Ke − g) = 0.30 × 1.06 ÷ (0.117 − 0.06) = 0.318 ÷ 0.057 = $5.58 per share ($27.9m).

(ii) P/E basis

Quoted P/E 12, discounted by one-third for lack of marketability → 8. Value = 0.50 × 8 = $4.00 per share ($20m).

(iii) Net assets: 16m ÷ 5m = $3.20 per share.

Explaining the range ($3.20 – $5.58)

Net assets is the floor — the minimum a seller should accept; it ignores goodwill, brand, workforce and earning power, so it is rarely the price for a going concern.

P/E values the earnings stream using the market's view of similar quoted companies; the discount is a judgement (⅓–½) reflecting that unquoted shares are illiquid and the company may be smaller/riskier than the proxies.

DVM is most relevant to a minority shareholder who only receives dividends; it relies on g continuing indefinitely (r and b constant) and on Ke from CAPM — small changes in Ke − g move the value a lot.

A majority buyer would prefer a cash-flow or earnings basis (control of the whole cash flow) and might add synergies; the actual price will be negotiated between the floor and the buyer's maximum.

DVMUses D1 = D0(1+g), not D0; Ke − g must be positive
P/EApply the discount — quoted P/E on unquoted earnings without adjustment is the standard lost mark
AssetsRealisable/replacement values, not book; deduct all liabilities and preference capital
CAPM"Equity risk premium" is already (Rm − Rf); do not subtract Rf again
Examiner trapIf the case gives a market return of 11% instead of a premium of 7%, Ke = 4% + 1.1 × (11% − 4%) = 11.7% — the same answer, but the wrong reading gives 16.1% and a value of $3.15.

Risk management: foreign currency and interest rates

The story
Lark Co is owed €500,000. It arrives in three months.
Lark Co sold goods to a customer in Europe. Lark’s own costs are in dollars. If the euro falls before the money arrives, the same sale brings in fewer dollars. Lark wants to know today how many dollars it will get. That is hedging.
First decision: which side of the quote?
Lark will sell its euros to the bank. The bank quotes the spot rate as:
€1.1200 – €1.1250 per $1
1.1250. The bank always wins. Lark is selling euros, so it gets the rate that gives it fewer dollars: 500,000 ÷ 1.1250 is less than 500,000 ÷ 1.1200. For a payment, it is the other side. This one decision is the most common wrong answer in Section A.
Money market hedge, one step at a time
Work each step out before you reveal it. Receipt: borrow foreign, deposit home. Payment: deposit foreign, borrow home.
1
TodayBorrow eurosBorrow just enough that loan plus interest equals the €500,000 Lark will receive. Euro borrowing costs 5% a year, so 3 months = 5% × 3/12.500,000 ÷ 1.0125 = €493,827
2
TodaySell the euros at spotThe bank buys euros at 1.1250.493,827 ÷ 1.1250 = $438,957
3
TodayPut the dollars on depositDollar deposits earn 3% a year: 3% × 3/12 = 0.75%.438,957 × 1.0075 = $442,250
4
In 3 monthsThe customer paysThe €500,000 receipt repays the euro loan exactly. Nothing is left exposed to the exchange rate.
Now compare with the forward contractForward: 500,000 ÷ 1.1210 = $446,030, received in three months.
Forward$446,030
Money market$442,250
The forward gives about $3,780 more. Both give certainty, so choose the forward.
1
TodayPut euros on depositDeposit just enough to grow into the €500,000 Lark must pay. Euro deposits earn 3.5% a year.500,000 ÷ (1 + 0.035 × 3/12) = €495,663
2
TodayBuy those euros at spotThe bank sells euros at 1.1200, the lower figure. Lark borrows the dollars to pay for them.495,663 ÷ 1.1200 = $442,556
3
TodayThe dollar loan growsDollar borrowing costs 6% a year: 6% × 3/12 = 1.5%.442,556 × 1.015 = $449,194
4
In 3 monthsPay the supplierThe euro deposit has grown to €500,000 and pays the supplier. Lark repays the dollar loan.
Now compare with the forward contractForward cost: 500,000 ÷ 1.1150 = $448,430. For a payment, the lower cost wins.
Forward$448,430
Money market$449,194
The forward costs about $764 less.
Pick the hedge
The discussion marks come from matching the instrument to the situation.
Tap a situation to see the instrument and why.
Forward contractFixes the rate. Binding, tailored to the amount and date, no cost upfront, but no upside if the rate moves your way.
Currency optionA right, not an obligation. A premium is payable. Use it when the cash flow is uncertain.
OptionIt keeps the upside, at the cost of a premium. Forwards and money market hedges both give the upside away.
Money market hedgeBorrow and deposit to build the same result yourself.
Forward rate agreement (FRA)Fixes the interest rate on a future loan for a period, for example a 3–6 FRA. Settled by difference, over the counter. A cap sets a maximum rate for a premium; selling interest rate futures also hedges borrowing.
SwapExchange floating for fixed interest. It exploits comparative advantage, but carries counterparty risk.
Hedge internally, for freeInvoice in the home currency, match receipts with payments, net within a group, lead or lag the payment. Or do nothing if it is small.
Examiner trapSection A staples: identify which rate to use from a bid/offer quote; calculate forward from IRP; compute the MMH result and compare to forward; one theory question (PPP vs IRP, transaction vs translation). Practise 10 of these tonight.
The rules, for revision
Open a topic when you want the full list.
Types of risk
TransactionActual cash flow gain/loss on a foreign-currency transaction between contract and settlement — hedge this.
TranslationAccounting effect of consolidating foreign assets/liabilities — no cash flow, usually not hedged.
EconomicLong-term effect of exchange-rate movements on competitiveness/PV of the business.
Interest rate riskGap exposure (mismatch of rate-sensitive assets/liabilities), basis risk (different reference rates), and the risk on future borrowing/deposits.
Exchange rate theory
Purchasing power parityS1 = S0 × (1 + hc) ÷ (1 + hb) — expected future spot from inflation differentials (c = counter/foreign currency, b = base)
Interest rate parityF0 = S0 × (1 + ic) ÷ (1 + ib) — forward rate from interest differentials; the currency with the higher rate is at a forward discount
Fisher(1 + i) = (1 + r)(1 + h) — real rates equalise across countries
Four-way equivalenceInterest differential = inflation differential = expected spot change = forward premium/discount
QuotesBank buys low, sells high. Receiving foreign currency → you sell it → bank buys → use the rate that gives you less home currency. Forward quoted as an adjustment to spot: ADDIS — ADD a DIScount, subtract a premium.
Internal hedging (free)

Invoice in home currency; matching receipts and payments (foreign-currency bank account); netting within a group; leading (paying early when the foreign currency is expected to strengthen) and lagging (delaying when it is expected to weaken); do nothing if small.

Interest rate — internalSmoothing (mix of fixed and floating), matching assets and liabilities, asset & liability management.
Choosing a hedgeHighest home-currency receipt / lowest home-currency cost wins; then comment on certainty, flexibility, cost (premium) and availability for the amount and date.
Money market hedge — the steps
Foreign RECEIPT in n months1. Borrow foreign currency now: amount = receipt ÷ (1 + foreign borrowing rate × n/12). 2. Convert at spot to home currency. 3. Deposit home currency at home deposit rate. 4. Receipt repays the foreign loan. Compare final home amount to forward.
Foreign PAYMENT in n months1. Deposit foreign currency now: amount = payment ÷ (1 + foreign deposit rate × n/12). 2. Buy that at spot with home currency (borrow it). 3. Home loan grows at home borrowing rate. Compare total home cost to forward.
Rule of thumbReceipt: borrow foreign, deposit home. Payment: deposit foreign, borrow home. Rates are annual — pro-rate them.
External hedging instruments
Forward contractFixes the rate; binding; tailored; no cost upfront; no upside
FuturesExchange-traded, standardised amounts and dates, margin, basis risk, imperfect hedge — describe, rarely calculate in FM
Options (currency)Right not obligation; premium payable; keeps upside; use when the cash flow is uncertain (e.g. tender)
Interest rate: FRAFixes the interest rate on a future loan/deposit for a period (e.g. 3–6 FRA); settled by difference; OTC
Interest rate options / guaranteesCap (max borrowing rate), floor, collar — premium
Interest rate futuresSell futures to hedge borrowing (rates up → futures price down → gain)
SwapsExchange fixed for floating interest; exploit comparative advantage; counterparty risk

Forward rate from interest rate parity

Worked example: money market hedge against a forward contract

A foreign currency receipt. This structure appears in Section A or B almost every sitting.

Lark Co (home currency $)

Question

Lark Co will receive €500,000 in three months.

Spot rate€1.1200 – €1.1250 per $1. Three-month forward: €1.1150 – €1.1210 per $1.
Annual interest ratesEuro borrowing 5%, dollar deposit 3%.

Required: which hedge gives the higher dollar receipt? (5 marks)

Answer

Forward contract

Lark sells euros → the bank buys euros → the bank uses the rate that gives Lark fewer dollars, i.e. the higher € per $ figure: 500,000 ÷ 1.1210 = $446,030, received in three months.

Money market hedge — a receipt, so: borrow the foreign currency now, sell it at spot, deposit the home currency.

1. Euro loan today so that loan + interest = €500,000 in 3 months: 500,000 ÷ (1 + 0.05 × 3/12) = 500,000 ÷ 1.0125 = €493,827

2. Convert at spot (bank buys euros at 1.1250): 493,827 ÷ 1.1250 = $438,957

3. Place on dollar deposit for 3 months at 3% × 3/12 = 0.75%: 438,957 × 1.0075 = $442,250

4. In three months the €500,000 receipt repays the euro loan exactly.

Comparison: forward $446,030 vs MMH $442,250 → the forward contract gives about $3,780 more. Both give certainty; choose the forward.

Why the marks go where they do

Right side of the quoteReceipt of foreign currency → you sell it → use the higher €/$ rate (bank sells $ dear). Payment → use the lower rate. Reverse the logic if the quote is $ per €.
Pro-rating5% and 3% are annual. Three months = × 3/12. Do not compound.
DirectionReceipt: borrow foreign, deposit home. Payment: deposit foreign, borrow home. Get this wrong and every number after it is wrong.
Comparison basisBoth figures are at the same date (three months). Never compare a spot conversion today with a forward amount without the deposit step.
CommentThe cheaper hedge wins, but note: forward is simpler and commits the company; MMH useful when forward market unavailable; both lose any favourable movement — an option would keep it at a premium.

Payment version — the mirror image

Paying €500,000 in 3 months, euro deposit 3.5%, dollar borrowing 6%: deposit €500,000 ÷ (1 + 0.035 × 3/12) = €495,663 now; buy those euros at spot 1.1200 (bank sells € — lower €/$ figure) = $442,556 borrowed today; repay 442,556 × (1 + 0.06 × 3/12) = $449,194 in three months. Compare with the forward cost 500,000 ÷ 1.1150 = $448,430.

Examiner trapSection A gives exactly one of these as a number-entry question. The two most common wrong answers are the other side of the spot quote and forgetting the 3/12.

Section B case drill: Pallas Co

Five independent 2-mark questions on a foreign currency payment. Allow 18 minutes.

Case 3 — Pallas Co (risk management, area G)

Pallas Co (home currency $) must pay €400,000 in six months.

Spot€1.3000 – 1.3050 per $1. Six-month forward: €1.2900 – 1.2960 per $1.
Annual ratesEuro deposit 3%, dollar borrowing 5%.

Q1Dollar cost using a forward contract =

Pallas buys euros → bank sells € at the lower €/$ rate: 400,000 ÷ 1.2900 = $310,078

Q2Euro deposit required today for a money-market hedge =

400,000 ÷ (1 + 0.03 × 6/12) = €394,089

Q3Dollar cost in six months using the money-market hedge =

394,089 ÷ 1.3000 = $303,145 borrowed now; × (1 + 0.05 × 6/12) = $310,724

Q4Which hedge should Pallas choose, and which risk is being hedged?

B. Forward is $646 cheaper; a contractual future payment is transaction exposure

Q5The forward rate shows the euro at a premium to the dollar. This is consistent with:

C. Interest rate parity: the currency with the lower interest rate is at a forward premium (3% vs 5%)
← PreviousFinance and cost of capitalNext →FM formulas

Frequently asked questions

What are the steps in a money market hedge?

For a foreign currency receipt: borrow the foreign currency now, convert it at spot, and deposit the home currency; the receipt repays the loan. For a payment: deposit the foreign currency now, buying it at spot with borrowed home currency. Interest rates are annual, so pro-rate them for the period.

Which exchange rate do I use from a bid and offer quote?

The bank buys low and sells high, so you always get the worse rate. If you are selling foreign currency, use the rate that gives you less home currency; if you are buying it, use the rate that costs you more.

Why discount the P/E ratio when valuing an unquoted company?

A quoted company’s shares are easy to sell and the company is usually larger and less risky. Applying a quoted P/E to an unquoted company without a discount of roughly one-third to one-half overstates its value, and it is the classic lost mark.

What is the difference between transaction, translation and economic risk?

Transaction risk is an actual cash gain or loss on a foreign currency transaction between contract and settlement, and it is the one companies hedge. Translation risk is an accounting effect on consolidation with no cash flow. Economic risk is the long-term effect of exchange rates on competitiveness.

Start your ACCA preparation

Hamzah Academy teaches every ACCA paper from BT to AAA, with live online classes, every class recorded, and specialist tutors with a decade or more of experience.

1. Ask us anything

Message our team about papers, sittings and fees.

WhatsApp us
2. Try a free lesson

Watch our tutors teach before you pay.

YouTube
3. Enrol online

Pick your paper and pay by card on our website.

Free courses

Related pages

How to pass ACCA FMFM: finance and cost of capitalFM: fm formulasACCA FM course
Hamzah Academy

Join Community

2000+ members

Hamzah Academy

150+ Videos

Instagram

350+ Posts

Important Links

Contact Us ACCA Global Office ACCA Exam/Key Dates Blog Privacy Policy Terms & Conditions Refund Policy

Sessions

December 2026
December 2026 March 2027

Contact Us

WhatsApp

+92 301 9191500

Call us

+92 301 9191500

Email

info@hamzah.academy

Facebook Page

18,000+ Followers

Study ACCA by Country

Azerbaijan · Bahrain · Bangladesh · Barbados · Botswana · Cambodia · Canada · China · Cyprus · Egypt · Georgia · Ghana · Hong Kong · India · Indonesia · Ireland · Jamaica · Kazakhstan · Kenya · Kuwait · Kyrgyzstan · Luxembourg · Malaysia · Maldives · Malta · Mauritius · Moldova · Myanmar · Nepal · Nigeria · Oman · Pakistan · Poland · Qatar · Rwanda · Saudi Arabia · Seychelles · Singapore · South Africa · Sri Lanka · Switzerland · Tanzania · Trinidad and Tobago · UAE · Uganda · UK · Uzbekistan · Vietnam · Zambia · Zimbabwe
© 2026 Hamzah Academy. All rights reserved.
Contact Foundation (FIA) WhatsApp Support